OFFICIAL-SOURCE PROJECT LIBRARY

Railway Projects — National Monitor

Searchable Railway + infrastructure records. The catalogue contains source-backed records plus clearly labelled reference records; reference records must be re-checked against the official source before being treated as a current status claim.

Ongoing72
Proposed9
Operational4
Completed2
DPR / Planning2
4 source-linked records · page 1/1
SafetyOngoing
SOURCE VERIFIED

Kavach 4.0 Safety System Rollout

📍 High-density and highly-utilised railway routes

Indigenous automatic train protection system being expanded across the network.

Published cost / outlayNot stated
Progress / scale2,633 route km commissioned as of Jul 2026
SafetyOngoing
SOURCE VERIFIED

Eastern Railway – Electronic Interlocking Upgrade

📍 32 stations on high-density / highly-utilised routes

Replacement of relay-based interlocking with electronic interlocking for improved safety and reliability.

Published cost / outlay₹405 Cr
Progress / scale32 stations
SafetyOngoing
SOURCE VERIFIED

Asansol Division Electronic Interlocking Project

📍 27 stations/cabins including 1 IBS location

Modern signalling upgrade on HDN/HUN routes in Asansol Division.

Published cost / outlay₹432 Cr
Progress / scale27 locations
SafetyCompleted
SOURCE VERIFIED

Western Railway Vadodara–Surat–Virar Kavach Section

📍 Vadodara – Surat – Virar

Kavach 4.0 commissioning milestone on the Delhi–Mumbai route.

Published cost / outlayNot stated
Progress / scale344 km commissioned Jan 2026