OFFICIAL-SOURCE PROJECT LIBRARY

Railway Projects — National Monitor

Searchable Railway + infrastructure records. The catalogue contains source-backed records plus clearly labelled reference records; reference records must be re-checked against the official source before being treated as a current status claim.

Ongoing72
Proposed9
Operational4
Completed2
DPR / Planning2
89 source-linked records · page 1/4
High-Speed RailOngoing
SOURCE VERIFIED

Mumbai–Ahmedabad High Speed Rail (MAHSR)

📍 Mumbai – Thane – Virar – Boisar – Vapi – Bilimora – Surat – Bharuch – Vadodara – Anand – Ahmedabad – Sabarmati

India’s first high-speed rail corridor, being developed by NHSRCL.

Published cost / outlay₹108,000 Cr
Progress / scale508 km · 12 stations planned
FreightOperational
SOURCE VERIFIED

Western Dedicated Freight Corridor (WDFC)

📍 Dadri – JNPT

Dedicated freight corridor connecting the northern freight market to JNPT.

Published cost / outlayNot stated
Progress / scale1,506 km · commissioned
FreightOperational
SOURCE VERIFIED

Eastern Dedicated Freight Corridor (EDFC)

📍 Ludhiana – Sonnagar

Dedicated freight route designed to move heavy freight away from passenger-focused routes.

Published cost / outlayNot stated
Progress / scale1,337 km · commissioned
FreightDPR / Planning
SOURCE VERIFIED

Dankuni–Surat East–West Dedicated Freight Corridor

📍 Dankuni – Surat

A new East–West DFC announced in Union Budget 2026–27.

Published cost / outlayNot stated
Progress / scaleDPR preparation / updation taken up
StationsOngoing
SOURCE VERIFIED

Amrit Bharat Station Scheme – National Programme

📍 1,340 identified stations across India

Nationwide phased station redevelopment programme focused on passenger amenities, access and city integration.

Published cost / outlayNot stated
Progress / scale261 completed as of 18 Jul 2026
StationsCompleted
SOURCE VERIFIED

75 Amrit Bharat Stations – July 2026 Package

📍 75 redeveloped stations

A major national tranche of redeveloped stations dedicated to the nation in July 2026.

Published cost / outlay₹1,570 Cr
Progress / scale75 stations dedicated on 18 Jul 2026
SafetyOngoing
SOURCE VERIFIED

Kavach 4.0 Safety System Rollout

📍 High-density and highly-utilised railway routes

Indigenous automatic train protection system being expanded across the network.

Published cost / outlayNot stated
Progress / scale2,633 route km commissioned as of Jul 2026
SafetyOngoing
SOURCE VERIFIED

Eastern Railway – Electronic Interlocking Upgrade

📍 32 stations on high-density / highly-utilised routes

Replacement of relay-based interlocking with electronic interlocking for improved safety and reliability.

Published cost / outlay₹405 Cr
Progress / scale32 stations
SafetyOngoing
SOURCE VERIFIED

Asansol Division Electronic Interlocking Project

📍 27 stations/cabins including 1 IBS location

Modern signalling upgrade on HDN/HUN routes in Asansol Division.

Published cost / outlay₹432 Cr
Progress / scale27 locations
New LineOngoing
SOURCE VERIFIED

Pirpainti–Jasidih New Rail Line

📍 Pirpainti – Jasidih

New line project improving connectivity between Bihar and Jharkhand.

Published cost / outlay₹2,700 Cr
Progress / scale38 km of 97 km commissioned
New LineOngoing
SOURCE VERIFIED

Bihar – Sanctioned Railway Project Portfolio

📍 Statewide portfolio

Aggregate portfolio of new lines, gauge conversion and doubling works falling fully/partly in Bihar.

Published cost / outlay₹96,651 Cr
Progress / scale59 sanctioned projects · 5,067 km
StationsOngoing
SOURCE VERIFIED

West Bengal – Amrit Bharat Station Redevelopment

📍 101 stations across West Bengal

Large station-modernisation programme under Amrit Bharat Station Scheme.

Published cost / outlay₹3,600 Cr
Progress / scale9 completed in Mar 2026 snapshot
Safety & CapacityOngoing
SOURCE VERIFIED

Indian Railways ROB/RUB Programme

📍 Level-crossing replacement works across Indian Railways

Road over/under bridges replacing level crossings to improve safety and road-rail mobility.

Published cost / outlay₹117,492 Cr
Progress / scale4,993 sanctioned works as of 1 Jun 2026
Passenger RailOperational
SOURCE VERIFIED

Vande Bharat Service Expansion

📍 National network

Indigenously designed semi-high-speed passenger services expanding across India.

Published cost / outlayNot stated
Progress / scale162 chair-car + 2 sleeper services reported
High-Speed RailDPR / Planning
SOURCE VERIFIED

Seven High-Speed Rail Growth Connectors

📍 Mumbai–Pune; Pune–Hyderabad; Hyderabad–Bengaluru; Hyderabad–Chennai; Chennai–Bengaluru; Delhi–Varanasi; Varanasi–Siliguri

Seven high-speed corridors announced as growth connectors in Union Budget 2026–27.

Published cost / outlay₹1,600,000 Cr
Progress / scaleNearly 4,000 km proposed network
ElectrificationOngoing
SOURCE VERIFIED

Rail Electrification – National Network

📍 Indian Railways network

Large-scale electrification programme reducing dependence on diesel traction and supporting energy-efficient operations.

Published cost / outlayNot stated
Progress / scale99.6% electrified by Jul 2026
FreightOperational
SOURCE VERIFIED

New Palanpur–New Rewari Trucks-on-Trains Service

📍 New Palanpur – New Rewari on WDFC

Rail freight service carrying trucks on trains to shift road freight to rail.

Published cost / outlayNot stated
Progress / scaleApprox. 636 km service span
StationsOngoing
SOURCE VERIFIED

Alwar Railway Station Redevelopment

📍 Alwar station on Delhi–Jaipur route

Station redevelopment under Amrit Bharat Station Scheme.

Published cost / outlay₹112 Cr
Progress / scaleRedevelopment in progress
SafetyCompleted
SOURCE VERIFIED

Western Railway Vadodara–Surat–Virar Kavach Section

📍 Vadodara – Surat – Virar

Kavach 4.0 commissioning milestone on the Delhi–Mumbai route.

Published cost / outlayNot stated
Progress / scale344 km commissioned Jan 2026
National ProgrammeOngoing
SOURCE VERIFIED

Indian Railways 2026–27 Capital Expenditure Programme

📍 Indian Railways capital investment programme

Record planned railway capital expenditure supporting infrastructure, capacity, safety and modernisation.

Published cost / outlay₹293,030 Cr
Progress / scale₹2,93,030 crore planned capex
Freight / NetworkProposed
REFERENCE — VERIFY CURRENT STATUS

North–South Dedicated Freight Corridor

📍 North–South Dedicated Freight Corridor

Named Indian railway infrastructure project or programme recorded for public reference.

Published cost / outlayNot stated
Progress / scaleReference record — verify current status
Freight / NetworkProposed
REFERENCE — VERIFY CURRENT STATUS

East Coast Dedicated Freight Corridor

📍 East Coast Dedicated Freight Corridor

Named Indian railway infrastructure project or programme recorded for public reference.

Published cost / outlayNot stated
Progress / scaleReference record — verify current status
High-Speed RailProposed
REFERENCE — VERIFY CURRENT STATUS

Delhi–Varanasi High Speed Rail Corridor

📍 Delhi–Varanasi High Speed Rail corridor

Named Indian railway infrastructure project or programme recorded for public reference.

Published cost / outlayNot stated
Progress / scaleReference record — verify current status
High-Speed RailProposed
REFERENCE — VERIFY CURRENT STATUS

Mumbai–Nagpur High Speed Rail Corridor

📍 Mumbai–Nagpur High Speed Rail corridor

Named Indian railway infrastructure project or programme recorded for public reference.

Published cost / outlayNot stated
Progress / scaleReference record — verify current status